< img height="1" width="1" src="https://www.facebook.com/tr?id=346240388205794&ev=PageView &noscript=1"/>
Production Workshop Of Stainless Steel Equipment
You are here: Home » News » Production Workshop Of Stainless Steel Equipment

Production Workshop Of Stainless Steel Equipment

Views: 11     Author: Site Editor     Publish Time: 2024-06-20      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Production Workshop Of Stainless Steel Equipment

车间生产

Our production workshop is equipped with state-of-the-art facilities designed to ensure the highest quality standards for stainless steel equipment. The production process for stainless steel equipment includes several key steps, each of which is critical to ensure the quality and performance of the final product. Below is a typical stainless steel equipment production process: 


1. Preparation of raw materials

Firstly, choose suitable high quality stainless steel raw materials. Commonly used types of stainless steel include 304 and 316, and the suitable material is selected according to the specific use of the equipment.

 

2. Cutting

Use high-precision cutting equipment, such as laser cutter or water cutter, to cut the stainless steel sheet into the required shape and size. Waterjet cutting technology uses high-pressure water and abrasives to cut stainless steel precisely, ensuring neat edges and minimal material waste.

 

3. Forming

The cut stainless steel sheet is formed into the required parts by bending, stamping and other forming processes. The forming process requires the use of professional bending machines and stamping equipment to ensure that the size and shape of the parts meet the design requirements.

 

4. Welding

The moulded parts are assembled together by welding. During the welding process, ensure that the weld seam is firm, even and free of porosity and cracks.

 

5. Polishing

After the welding is completed, the equipment is polished. Polishing not only enhances the appearance of the equipment, but also increases its corrosion resistance. Use different grits of polishing compounds and polishing tools to gradually improve the surface finish.

 

6. Inspection

After polishing is completed, the equipment is thoroughly inspected. The inspection includes dimensional measurements, weld quality, surface finish, and so on. Ensure that all the indicators of the equipment are in line with the design requirements and quality standards.

 

7. Cleaning

After the inspection of qualified equipment will be cleaned to remove the surface oil, dust and polishing residues. The cleaning process uses professional stainless steel cleaning agent to ensure that the equipment is hygienic and clean.

 

8. Assembly

For the equipment to be assembled, the parts will be assembled in accordance with the design drawings. During the assembly process, pay attention to the firmness and sealing of each connection point to ensure the functionality and safety of the equipment.

 

9. Quality Control

Strict quality control is carried out in every step of the production process. Through many inspections and tests, we ensure that the quality of the final product meets the requirements of customers and industry standards.


Value-Added Equipment Solution Provider
 +86-17317120736             
 +86-18616564936
 Building 7, No.115 Xiangjing Road, Songjiang District, Shanghai, China

QUICK LINKS

Application

PRODUCT CATEGORY

Drying Equipment
Copyright © Shanghai Valuen Industrial Co., Ltd. All Rights Reserved.
Contact Us